capacity Capacity of the Plant/Unit (at 100% capacity utilization)

38,000 Kgs


Year wise capacity utilization

image

Year 1

55%

image

Year 2

95%


Raw Materials Required

entreprenuearship
  • Guggal
  • Sandalwood Powder
  • Dhoop Powder
  • Cascalia Powder
  • Charcoal Powder
  • Groundnut Shell
  • Wood Dust
  • Diethyl Phthalate (D.E.P)
  • Jigat Powder
  • Perfumes
  • Plasticizer
  • Preservative
  • Packing
  • Bamboo Sticks

Final Product

xyz

Infrastructure Required

image Land & Buildings
image Factory

Plant & Machinery Required

  • Incense Stick Making Machine
  • Leaf Cutting Machine
  • Heat Sealing Machine
  • Sieves
  • Weighting Balance
  • Aluminium Tra

Emploment Generation:

Skilled

Unskilled


Leasehold/Freehold Land 64,000.00
Civil Works and Buildings 700000.00
Plant and Machinery 268570.00
Amount Percentage
Own Capital (40% of A+C) 725182.00 50%
Working Capital (60% of B) 1087773.00 50%
Total Loan 18,12,995.00 100%

Financial Benchmarks

image

Year 1

image

Year 2

image

Year 3

image

Year 4

Target Revenue 5,00,000.00 5,00,000.00 5,00,000.00 5,00,000.00
Break Even Point 15% 20% 25% 30%
DSCR including Principal Repayment 7.11 7.11 7.11 7.11

Power rate per unit 8.5 Rs / unit
Power Requirement Under 19 kwt
Water Requirement -
Whether the service is in the negative list under NEIDS and MSME? No
background image